Despite the immense amount of work done to the Bill Putnam Hut at Fairy Meadows during nearly 4 weeks in August and October of 2006, a further week of work was arranged for September 2007.  A group of 10 volunteers and 3 ACC staff members assembled at the staging area late Friday evening: Km 98 on the Big Bend Highway at Cariboo Creek, along the east side of Kinbasket Lake.  Saturday morning, the work began, organizing all the loads of equipment and materials that were to be flown to the Hut that day.  By mid-afternoon, we were alone at the hut with a week and a myriad of tasks before us.

     Included in the project list: replacing the sauna floor, building a woodshed, repairing stairs and flight deck at the biffy, new drying racks, repairing/re-routing the propane line, painting, completing finish in loft, rebuilding the deck railing, filling the woodshed, sanding and re-finishing tables.....and the list goes on.

     The following pictures will give a small idea of the frenetic activity during the week.  

    Note: this page is still under development.

     Click on the thumbnails to see the full-sized image.

     Photo credits thanks to: Karen Rollins (kr), Jon Rollins (jr), (where I could tell the difference!), Dave McCormick (dm), John Derick (jd),

Personal viewpoints: http://newmtnview.blogspot.com/2007/09/combining-work-and-party.html

 

The helicopter arrives at 9 am and once things start, the pace won't let up until all loads and personnel are delivered to the hut (kr) P9070011_1.jpg (36981 bytes) P9080016_1.jpg (61065 bytes) First, the chopper shuts down to allow everyone a bit of time to organize, meet the pilot, listen to the safety talk.... (kr)
Loads get organized (kr), P9070015_1.jpg (79635 bytes) loadliftsoff.jpg (40161 bytes) Loads lift off (dm),
And finally, the last workers get flown up (dm), lakeview.jpg (23416 bytes) P9080019_1.jpg (43604 bytes) Across Kinbasket Lake (kr),
To the Bill Putnam Hut at Fairy Meadows (dm). hutview.jpg (108020 bytes) toolroom.jpg (79848 bytes) A tool room was set up (dm)
And the work begins:  Linda helps dig the new propane line into place... (dm) propaneline2.jpg (74853 bytes) P9120032_1.jpg (68374 bytes) and sands and paints all the faded and peeling window trim (kr)
The barrel room and biffy are pulled back into shape, damage from the snows of winter (dm) biffyfix.jpg (68085 bytes) dryingrack.jpg (49595 bytes) New drying racks get built and installed the very last evening (dm)
Dave gets working at staining the cedar siding (dm) painting1.jpg (78304 bytes) IMG_0023.jpg (56572 bytes) More new drying racks and freshly sanded and painted benches add the finishing touches to the hut (jd)
 

The new woodshed goes up in just a couple of days and even gets loaded with wood using a version of the Scottish caber toss taught to us by Chris.  Now we wish we'd all brought hard hats!

 

 

P1010049.jpg (99041 bytes)

(jd)

 

woodshed2.jpg (74281 bytes)

(dm)

P9110027_1.jpg (64344 bytes)

(kr)

P9120041_1.jpg (59169 bytes)

(kr)

woodshed.jpg (104254 bytes)

(jd)

IMG_0076.jpg (100331 bytes)

(jd)

 

 

 

Some of the faces in the works......

 

P9120051_1.jpg (54041 bytes)

Andrew Fisher needs all his appendages in the kitchen (kr)

P9120058_1.jpg (57101 bytes)

Dana Engler pauses only briefly for the photo op (kr)

P9120059_1.jpg (65552 bytes)

Dave McCormick concentrates on his work (kr)

P9140088_1.jpg (54197 bytes)

Vera Fuhrmann provides support in the kitchen and elsewhere (kr)

P9120057_1.jpg (75112 bytes)

Linda at work on the propane line (kr)

P9130078_1.jpg (45677 bytes)

Karen Rollins during a short break late in the week (jr)

andy.jpg (33159 bytes)

Andy maintains his sense of humour despite the massive feeding demands (dm)

P9120060_1.jpg (65873 bytes)

Kris sands the new deck railings (kr)

P9120045_1.jpg (51835 bytes)

Roger building the freezer compartment (kr)

jcd.jpg (61013 bytes)

John Derick gets a belated start on the sauna (dm)

phil_roger.jpg (92885 bytes)

Phil and Roger work on repairing steps and railings (dm)

P9120043_1.jpg (64684 bytes)

Chris concentrates on his saw work while Vera cleans up (kr)

peter_dishes.jpg (54385 bytes)

A rare photo of Peter Fuhrmann doing dishes (dm)

propaneline1.jpg (64640 bytes)

Kris Boyer chops through roots making way for the relocated propane line (dm)

P1010050.jpg (105045 bytes)

And lays in the relocated propane line (jd)

 

P1010046.jpg (74042 bytes)

Kris and Linda (jd)

P1010183_2.jpg (41783 bytes)

Staff was always bright-eyed and ready to go each morning (jd)

P1010096.jpg (83852 bytes)

John lays out the new stairs to the barrel room and propane deck (jd)

jon.jpg (35338 bytes)

Jon Rollins works on new stair treads (kr)

P1010140.jpg (88305 bytes)

Evening was a time to relax, mostly, and visit with members of the group. (jd)

 

And there was no shortage of scenery which we could enjoy every day from our work areas around the hut and for the few short hours that we were allowed to take off for a short hike late in the week.....

 

 

 

 

kinbasketlake.jpg (48478 bytes)

Views up Kinbasket Lake on the way to the staging area (dm)

 

sandbeach.jpg (79552 bytes)

A sand beach encountered on our Friday morning hike (dm)

 

Finally, the week is over, although work continues almost to the minute the chopper arrives to whisk us back to our vehicles.  We do manage to arrange a group photo on the deck.  In about 4 hours, all the gear and the work crew are gone and the hut sits waiting for its winter visitors.

 

workgroup.jpg (93745 bytes)

(dm)

P1010184.jpg (84312 bytes)

(jd)

 

IMG_0053.jpg (86272 bytes)

(jd)

 

P9120030_1.jpg (41391 bytes)

(kr)

Last Updated - September 24, 2007